Integrated Solutions in Enhanced
Oil Recovery (EOR)
We don't just offer equipment; we deliver a technical-economic model designed to optimize the recovery factor.
Services
Engineering
and Design
Procurement
Specialized and
Commissioning
Business
Continuity
and Production
Optimization
Engineering and Design
- Evaluation of candidate wells. Visualization and capture of needs.
- Design of cyclic steam injection systems and cycles
- Technical characterization (API, viscosity, pressure, saturation).
- Sizing of steam generation and injection.
- Technical and economic evaluation of the project.
Specialized Procurement and Commissioning
Steam generators.
Pre-insulated pipe.
Water treatment systems.
Distribution and injection systems.
Instrumentation and thermal control.
Business Continuity and
Production Optimization
- Execution of thermal cycles.
- Operation of steam generation plants with specialized personnel.
- Performance monitoring.
- Post-cycle optimization.
- Maintenance Level I to IV
- Contractor Management
- Project management
- Operational and Environmental Safety.
ECONOMIC IMPACT AND RESULTS
- Significant increases in hot production compared to cold production.
- Average duration of the thermal effect between 12 and 16 months.
- Increase in hot production of up to 600%.
- Thermal recovery allows for sustainable incremental production of extra-heavy crude oils, improving the asset's cash flow and extending its productive life.
- The project's CAPEX can be financed with the increased production generated by the thermal cycle itself.
Thermal recovery is not an operating cost; it is a productive investment